Strathfield Slab-on-Ground Excavation Project

Completed Project · Strathfield, Sydney

Full Groundworks Package for a Slab-on-Ground Build

Imperial Excavation Group delivered the site benching, deep pier drilling, pool excavation, strip footings, spoil handling, backfilling and final slab preparation for Futureview.

BuilderFutureview
ProjectSlab-on-ground residence
DeliveryComplete excavation package
Completed site benching and ground preparation for Futureview in Strathfield

Whole-site benching and formation preparation before foundation works.

Project Overview

One Contractor from Site Bench to Slab Preparation

Imperial was engaged to coordinate the excavation and groundworks package around Futureview’s construction sequence. Delivering the bulk cut, detailed foundations, pool excavation, deep pier drilling and backfill under one scope reduced contractor handovers and gave the builder a clearer path through the foundation stage.

The site was progressively benched and trimmed to suit the slab-on-ground design. Our team then completed more than 70 structural piers, excavated the pool and strip footings, managed rock where required and prepared the platform for following trades.

70+structural piers
450mmpier diameter
3–6mapproximate depth
2excavator sizes

Scope Delivered

Bulk, Detailed and Structural Groundworks

Whole-site benching and level preparation
More than 70 structural piers
450mm piers at approximately 3–6m deep
Pool excavation to required levels
Detailed strip-footing excavation
Rockbreaking where required
Spoil loading, cartage and site management
Backfilling and slab preparation
Plant and attachments: Yanmar 5T excavator, 1.7T excavator, 450mm auger, rockbreaker and tipper trucks.

Builder Coordination

Sequenced Around the Foundation Program

The excavation, pier and backfill stages were coordinated around Futureview’s program and site instructions. The 5T excavator completed the primary excavation and auger work, while the compact 1.7T machine supported detailed work where manoeuvrability mattered. Spoil and rock were managed progressively so working areas remained practical for the next stage.

Completed Result

A Clean, Slab-Ready Foundation Platform

After the structural excavation was completed, the site was backfilled and trimmed in preparation for the new slab. The completed package left Futureview with a coordinated foundation platform ready for the following construction trades.

Client: Futureview · Location: Strathfield, Sydney

Planning a Similar Project?

Send the site address, structural plans and available geotechnical report. Imperial will assess access, pier requirements, ground conditions, cartage and excavation sequencing before preparing a site-specific proposal.

Request an Excavation Quote →
Scroll to Top